Ahead of every front.
Frontwatt turns over 100 weather scenarios into probabilistic power forecasts for wind, solar and hydro plants, then picks the day-ahead schedule with the lowest expected imbalance cost.
A cold front passes a 120 MW wind farm
Illustrative example with synthetic data
- Median forecast (P50)
- 50% range (P25–P75)
- 80% range (P10–P90)
- Actual output
- Day-ahead schedule
- Actual
- Schedule
- Median
- 50% range
- 80% range
The range widens where the timing of the front is uncertain. The schedule leans low there, because on this day promising energy that might not arrive is the costlier mistake.
Hover over the chart or focus it and use the arrow keys to read each hour.
Show the numbers
| Hour | P10 | P25 | P50 | P75 | P90 | Actual | Schedule |
|---|---|---|---|---|---|---|---|
| 00:00 | 88 | 94 | 99 | 104 | 108 | 101 | 97 |
| 01:00 | 90 | 96 | 101 | 106 | 110 | 104 | 99 |
| 02:00 | 91 | 97 | 103 | 108 | 112 | 106 | 101 |
| 03:00 | 92 | 98 | 104 | 109 | 113 | 103 | 102 |
| 04:00 | 90 | 97 | 103 | 108 | 112 | 105 | 101 |
| 05:00 | 88 | 95 | 102 | 107 | 111 | 100 | 100 |
| 06:00 | 85 | 93 | 100 | 106 | 110 | 102 | 98 |
| 07:00 | 82 | 91 | 99 | 105 | 110 | 97 | 96 |
| 08:00 | 78 | 89 | 97 | 104 | 109 | 99 | 94 |
| 09:00 | 72 | 85 | 95 | 103 | 109 | 94 | 91 |
| 10:00 | 62 | 79 | 92 | 101 | 108 | 88 | 85 |
| 11:00 | 48 | 70 | 87 | 98 | 106 | 74 | 76 |
| 12:00 | 33 | 56 | 79 | 94 | 104 | 52 | 64 |
| 13:00 | 22 | 40 | 66 | 86 | 99 | 34 | 48 |
| 14:00 | 16 | 28 | 50 | 74 | 92 | 27 | 36 |
| 15:00 | 14 | 22 | 37 | 60 | 82 | 24 | 28 |
| 16:00 | 15 | 21 | 30 | 46 | 66 | 26 | 26 |
| 17:00 | 18 | 24 | 31 | 41 | 55 | 31 | 29 |
| 18:00 | 22 | 29 | 36 | 44 | 55 | 38 | 34 |
| 19:00 | 27 | 34 | 41 | 49 | 60 | 44 | 39 |
| 20:00 | 31 | 38 | 46 | 54 | 65 | 47 | 44 |
| 21:00 | 34 | 42 | 50 | 58 | 69 | 53 | 48 |
| 22:00 | 36 | 44 | 52 | 61 | 72 | 51 | 50 |
| 23:00 | 37 | 45 | 53 | 62 | 73 | 55 | 51 |
Single numbers hide the risky hours
When a front moves through, a wind farm can lose most of its output in a few hours. A point forecast puts that drop at one hour and says nothing about how sure it is.
If the front comes early or late, the gap between your schedule and your meter is settled at imbalance prices, and in some markets a deviation penalty comes on top.
With Frontwatt you see
- The likely range of output for every hour, not just a midpoint.
- Where that range widens, so you know which hours carry the risk.
- A schedule chosen for what being long or short will cost you.
How Frontwatt works
The same five steps run for every plant, each time a new weather model run is published.
Sample the weather
We read the latest runs of AI-based and physics-based global weather models at your plant and at every turbine. Together they describe over 100 equally plausible versions of tomorrow.
Turn weather into power
Each scenario runs through a model of your plant: turbine power curves at hub height with air-density correction, a full photovoltaic chain for solar, flow and reservoir behaviour for hydro. A machine-learning layer then calibrates the result on your own metered history.
Keep the uncertainty
You get P10 to P90 ranges for every hour. Portfolio totals are added up scenario by scenario, so the range reflects how your plants actually move together.
Choose the schedule
For each hour, Frontwatt picks the schedule with the lowest expected cost under your market's imbalance prices and penalty bands, and exports it in the format your market expects.
Check the result
After delivery, we compare forecast, schedule and metered output for every plant and calculate what the imbalance cost.
What’s included
For every technology
For your team
Maintenance and curtailment
Enter planned limits once. Every forecast and schedule respects them.
Exports and API
Excel, CSV and ENTSO-E XML files, or pull everything through the REST API.
Data import
Upload production history, outages and plant inventories as CSV or Excel files.
Daily scorecards
Error against metered output and against your submitted schedule, plant by plant.
Measured, not marketed
Forecast providers rarely publish how they score themselves. Frontwatt stores every forecast with its timestamp and scores it against what your meters recorded, with the same rules for every plant.
- Scored at your deadline
- We score the forecast that existed when you had to decide, not a later revision.
- Normalised to capacity
- nMAE is the average hourly error divided by installed capacity, the yardstick the industry uses.
- Gaps stay gaps
- Hours without metered data are reported as missing. They are never filled with zeros.
- Next to your schedule
- Where your submitted schedule is available, its error appears next to ours.
- New models earn their place
- A model replaces the current one only after it wins on locked test periods that cover two seasons.
Built global, deployed local
The forecasting core works anywhere. What differs between markets is the schedule format, the price data and the penalty rules, so each market gets its own module.
| Market | Status | What’s included |
|---|---|---|
| Türkiye | Live | KGÜP day-ahead schedules ready for submission, EPİAŞ prices and metered output, imbalance and KÜPST cost tracking. |
| Europe | Planned | ENTSO-E schedule documents and 15-minute resolution. |
| Other markets | On request | Probabilistic forecasts for wind, solar and hydro plants. Tell us where your plants are. |
How we handle your data
Your production and outage data is used to forecast your plants and for nothing else. It is never shared with other customers.
Each portfolio is kept separate from every other and has its own access keys.
See tomorrow’s range before you bid
Tell us about your plants. We’ll walk you through a live portfolio and show what a pilot with your data would look like.